PIP STE02465 complements PIP STS02465 and provides assistance to the engineer in the preparation of contract documents for furnishing and installing ACIP piles.
This Practice is modeled on DFI TM-ACIP-1 (Augered Cast-in-Place Piles Manual). For additional information, refer to that manual and also to DFI TM-ACIP-2 (Augered Cast-in-Place Piles Inspector’s Guide).
This Practice does not provide guidelines for lateral displacement or drilled displacement piles, also known as augered cast-in-place displacement (ACIP-D) piles. DFI manuals, the Federal Highway Administration documents and a geotechnical engineer with experience designing ACIP-D piles should be consulted for guidance on ACIP-D piles.
Product Details
- Published:
- 02/01/2012
- Number of Pages:
- 32
- File Size:
- 1 file , 280 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus