ASME BPVC.XI.2-2025

Original price was: $915.00.Current price is: $549.00.

2025 ASME Boiler and Pressure Vessel Code, Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities

Standard by ASME International, 07/01/2025

PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download

2025 ASME Boiler and Pressure Vessel Code, Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities

Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. This Division provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants; it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.

Product Details

Revision: 2025 Edition

Published Date: July 1, 2025

Status: Active, Most Current

Document Language: English

Published By: ASME International (ASME)

Page Count: 152

ANSI Approved: Yes


Browse related standards from ASME International

ASME International > Boilers and Pressure Vessels Code

Reviews

There are no reviews yet.

Be the first to review “ASME BPVC.XI.2-2025”

Your email address will not be published. Required fields are marked *